BASE HEADER

Yes

Preferred Options 2025

ID sylw: 107133

Derbyniwyd: 24/02/2025

Ymatebydd: Natural England

Crynodeb o'r Gynrychiolaeth:

Natural England welcomes the submission of HRA and SEA for the local Plan.
Natural England would expect significant mitigation measures to be secured to protect these
designated sites from the proposed new settlements BW and F1 due to their size/scale and
proximity.
Criteria-based policies are required to guide development and should include application of the mitigation hierarchy and how the direct, indirect and cumulative impacts of development on designated sites will be addressed. Where mitigation or avoidance is not possible the site should not be allocated.