We are very concerned that the SWLP is advancing with infrastructure requirements not yet identified, to be delivered by sites in spatial growth locations where yield and capacity is not specified. It is impossible at this stage to establish the viability ā and thus deliverability ā of sites in the spatial growth locations. This is not a matter to be deferred to the Publication Consultation (this being the final consultation prior to the SWLP being submitted for examination).
We consider that infrastructure requirements and site capacity be the subject of detailed work prior to any work progressing on the Publication draft SWLP. The detailed work should be in collaboration with site promoters so as to bring forward genuinely deliverable site options.