The 2024 Stratford-Honeybourne SOBC Refresh rail study needs to be incorporated into the Infrastructure Delivery Plan. This integration is essential for securing developer contributions towards the rail link, which is a critical component of the emerging Worcester-Parkway-Evesham-LMAGV-Stratford-Hatton-Warwick-Leamington (A46 corridor) development arc, as outlined in the final report.
By including this study in the plan, the South Worcestershire Local Plan (SWLP) can effectively mobilise the necessary funding and resources to improve transportation infrastructure. This is vital to accommodate the current and future growth in the region, which is critical to achieving sustainability and fulfilling the vision and strategic objectives of the SWLP.