BASE HEADER

No

Preferred Options 2025

ID sylw: 107838

Derbyniwyd: 05/03/2025

Ymatebydd: Catesby Estates Ltd

Asiant : Pegasus Group

Crynodeb o'r Gynrychiolaeth:

Again, these matters are already covered by the Building Regulations, and as such do not need to be addressed in a policy which goes beyond these. The Building Regulations will apply, and developers will need to adhere to these, securing climate resilient design with or without a development plan policy on this.

It is noted that the policy seeks to introduce a climate change checklist for South Warwickshire, which will need to be completed and submitted as part of planning applications. Further details should be provided on what this checklist covers, whether in the policy or within the supporting text. In addition, there should be a clear justification for referencing this within the policy, and the requirements which will need to be met. The checklist must not place onerous requirements on developers which exceed the requirements of the Building Regulations.