BASE HEADER

Other

Preferred Options 2025

ID sylw: 108866

Derbyniwyd: 07/03/2025

Ymatebydd: Warwickshire County Council

Crynodeb o'r Gynrychiolaeth:

Minerals and Waste

No objections on mineral sterilisation grounds subject to prior extraction of minerals and subject to
• Minerals Assessment Report (for assessing the possible impact on mineral resources and determining whether prior extraction is achievable),
• Materials Management Report (for assessing the sourcing and use of construction materials including the availability of on-site materials for reuse/recycling),
• Waste Site Assessment (for assessing the extent to which an existing waste site/use/operation would be prejudiced) (Finham Sewage Works),
• Site Waste Management Plan (a plan for reusing/recycling waste on site and avoiding off-site disposal to landfill),
• Soil Management Plan (a plan to manage all soils on site during construction)

Highways / Transport

There will be a need for detailed modelling to take place once there is an idea of numbers and more specific locations. The County Council will continue to work with the South Warwickshire Local Plan Team as thinking progresses.

Public transport availability can be assessed once further information is available about numbers and location.

Primary Education

This site is not suitable from an education perspective.
There are no available safe walking routes to schools.
Development would require the expansion of existing schools or, if development is circa 1,000 new dwellings, then we could look to deliver a new on-site primary school.
Significant home to school transport implications.

Secondary Education

This site is not suitable from an education perspective.
There are no available safe walking routes to schools.
Development on this site will require the provision of new secondary places and would have to be linked with other growth to support the delivery of a new secondary school.
Significant home to school transport implications.

Early Years

We would expect development at this site to support the provision of on site early years places.