BASE HEADER
No
Preferred Options 2025
ID sylw: 108868
Derbyniwyd: 07/03/2025
Ymatebydd: Warwickshire County Council
Minerals and Waste
OBJECT to possible sterilisation of brick clay and subject to
• Minerals Assessment Report (for assessing the possible impact on mineral resources and determining whether prior extraction is achievable),
• Materials Management Report (for assessing the sourcing and use of construction materials including the availability of on-site materials for reuse/recycling),
• Site Waste Management Plan (a plan for reusing/recycling waste on site and avoiding off-site disposal to landfill),
• Soil Management Plan (a plan to manage all soils on site during construction)
Highways / Transport
There will be a need for detailed modelling to take place once there is an idea of numbers and more specific locations. The County Council will continue to work with the South Warwickshire Local Plan Team as thinking progresses.
Public transport availability can be assessed once further information is available about numbers and location.
Primary Education
There could be limited capacity available after the expansion of St John’s Primary and the delivery of a new school at Thickthorn.
Secondary Education
As with other Kenilworth/Coventry proposals, there will be the need for a new secondary school.
Home to school transport implications.