Crynodeb o'r Gynrychiolaeth:

Minerals and Waste

OBJECT to possible sterilisation of sand and gravel and subject to
• Minerals Assessment Report (for assessing the possible impact on mineral resources and determining whether prior extraction is achievable),
• Minerals Site/Infrastructure Assessment (for assessing the possible impact on existing sites and infrastructure),
• Materials Management Report (for assessing the sourcing and use of construction materials including the availability of on-site materials for reuse/recycling),
• Soil Management Plan (a plan to manage all soils on site during construction)

Highways / Transport

There will be a need for detailed modelling to take place once there is an idea of numbers and more specific locations. The County Council will continue to work with the South Warwickshire Local Plan Team as thinking progresses.

Public transport availability can be assessed once further information is available about numbers and location.

Primary Education

There could be an option to expand Newburgh School back up to former capacity.
This will require capital works as former classrooms are now being used for Early Years and Special Needs.
Could take up to 800 new dwellings.

Secondary Education

Some capacity at Aylesford School. Will depend on numbers.
Could take up to 800 new dwellings.