BASE HEADER
Other
Preferred Options 2025
ID sylw: 108877
Derbyniwyd: 07/03/2025
Ymatebydd: Warwickshire County Council
Minerals and Waste
No objections on mineral sterilisation grounds subject to prior extraction of minerals and subject to:
• Minerals Assessment Report (for assessing the possible impact on mineral resources and determining whether prior extraction is achievable),
• Materials Management Report (for assessing the sourcing and use of construction materials including the availability of on-site materials for reuse/recycling),
• Waste Site Assessment (for assessing the extent to which an existing waste site/use/operation would be prejudiced) (Kingston Grange),
• Site Waste Management Plan (a plan for reusing/recycling waste on site and avoiding off-site disposal to landfill),
• Soil Management Plan (a plan to manage all soils on site during construction)
Highways / Transport
There will be a need for detailed modelling to take place once there is an idea of numbers and more specific locations. The County Council will continue to work with the South Warwickshire Local Plan Team as thinking progresses.
Public transport availability can be assessed once further information is available about numbers and location.
Primary Education
Possible link to Upper Lighthorne?
Access the relocated Lighthorne Heath Primary School.
Need to consider connectivity – safe walking route or home to school transport implications.
Secondary Education
No local capacity.
Kineton will already have to be expanded to cope with the existing planned growth.
Need to consider in line with new settlements or growth South of Stratford / Wellesbourne.
Possible new provision.