BASE HEADER

No

Preferred Options 2025

ID sylw: 108881

Derbyniwyd: 07/03/2025

Ymatebydd: Warwickshire County Council

Crynodeb o'r Gynrychiolaeth:

Minerals and Waste

OBJECT to the potential loss of Shipston on Stour HWRC.
No objections on mineral sterilisation grounds subject to the exclusion of the all the land east of the village and subject to:
• Minerals Assessment Report (for assessing the possible impact on mineral resources and determining whether prior extraction is achievable),
• Materials Management Report (for assessing the sourcing and use of construction materials including the availability of on-site materials for reuse/recycling),
• Waste Site Assessment (for assessing the extent to which an existing waste site/use/operation would be prejudiced) (HWRC)
• Site Waste Management Plan (a plan for reusing/recycling waste on site and avoiding off-site disposal to landfill),
• Soil Management Plan (a plan to manage all soils on site during construction)

Highways / Transport

There will be a need for detailed modelling to take place once there is an idea of numbers and more specific locations. The County Council will continue to work with the South Warwickshire Local Plan Team as thinking progresses.

Public transport availability can be assessed once further information is available about numbers and location.

Education

Very limited capacity locally. Maximum of 100 new homes.

Primary Education

Need to consider links to possible new provision at Long Marston.

Secondary Education

Need to consider links to new provision at Long Marston.

New secondary school required in he Stratford area.