BASE HEADER

No

Preferred Options 2025

ID sylw: 108882

Derbyniwyd: 07/03/2025

Ymatebydd: Warwickshire County Council

Crynodeb o'r Gynrychiolaeth:

Minerals and Waste

OBJECT to the potential loss of Burton Farm HWRC.
No objections on mineral sterilisation grounds and subject to:
• Materials Management Report (for assessing the sourcing and use of construction materials including the availability of on-site materials for reuse/recycling),
• Waste Site Assessment (for assessing the extent to which an existing waste site/use/operation would be prejudiced) (HWRC),
• Site Waste Management Plan (a plan for reusing/recycling waste on site and avoiding off-site disposal to landfill),
• Soil Management Plan (a plan to manage all soils on site during construction)

Highways / Transport

There will be a need for detailed modelling to take place once there is an idea of numbers and more specific locations. The County Council will continue to work with the South Warwickshire Local Plan Team as thinking progresses.

Public transport availability can be assessed once further information is available about numbers and location.

Primary Education

Some limited capacity at Bishopton Primary and possibly the relocated Shottery St Andrew’s Primary. Max of 300 new dwellings

Secondary Education

No provision to provide any further nonselective places unless a new school is provided in the Stratford area.
No further growth in Stratford can be supported.