BASE HEADER
No
Preferred Options 2025
ID sylw: 108885
Derbyniwyd: 07/03/2025
Ymatebydd: Warwickshire County Council
Minerals and Waste
OBJECT on possible mineral sterilisation grounds and subject to:
• Minerals Assessment Report (for assessing the possible impact on mineral resources and determining whether prior extraction is achievable),
• Materials Management Report (for assessing the sourcing and use of construction materials including the availability of on-site materials for reuse/recycling),
• Soil Management Plan (a plan to manage all soils on site during construction)
Highways / Transport
There will be a need for detailed modelling to take place once there is an idea of numbers and more specific locations. The County Council will continue to work with the South Warwickshire Local Plan Team as thinking progresses.
Public transport availability can be assessed once further information is available about numbers and location.
Primary Education
No local availability or provision to expand.
Would require new provision – minimum of 1,000 new dwellings to support this. .
Secondary Education
Limited capacity at Alcester although this is at the Catholic Secondary School and this might not be seen as appropriate by some parents.
Work would be required to determine if Alcester Academy can be expanded. Likely to require significant build costs due to site constraints.
Possibility that growth at Bidford and Alcester could support the delivery of a new secondary offer. This would though need circa 5,000 new dwellings to make it viable.