BASE HEADER

Other

Preferred Options 2025

ID sylw: 108886

Derbyniwyd: 07/03/2025

Ymatebydd: Warwickshire County Council

Crynodeb o'r Gynrychiolaeth:

Minerals and Waste

No objections on mineral sterilisation grounds subject to prior extraction of sand and gravel and subject to:
• Minerals Assessment Report (for assessing the possible impact on mineral resources and determining whether prior extraction is achievable),
• Materials Management Report (for assessing the sourcing and use of construction materials including the availability of on-site materials for reuse/recycling),
• Waste Site Assessment (for assessing the extent to which an existing waste site/use/operation would be prejudiced) (The Slough),
• Soil Management Plan (a plan to manage all soils on site during construction)

Highways / Transport

There will be a need for detailed modelling to take place once there is an idea of numbers and more specific locations. The County Council will continue to work with the South Warwickshire Local Plan Team as thinking progresses.

Public transport availability can be assessed once further information is available about numbers and location.

Primary Education

Some capacity in existing provision.
Push back of Worcestershire children for future admissions.
This will depend on size of growth.

Secondary Education

Some capacity in existing provision.
Push back of Worcestershire children for future admissions.
This will depend on size of growth.
Studley High School keen to expand.