BASE HEADER
Other
Preferred Options 2025
ID sylw: 108924
Derbyniwyd: 07/03/2025
Ymatebydd: Warwickshire County Council
Crynodeb o'r Gynrychiolaeth:
WCC Ecology would like the policy to include a porous surface metric to be included in the policy. A simple metric that calculates the current and future permeable surface values based on the CIRIA methodology and where there is a residual loss compensation is required. Reason: to ensure aquifer recharge is not impacted upon through development.