BASE HEADER
Gwrthwynebu
Alternative Sites Consultation
ID sylw: 44015
Derbyniwyd: 17/03/2010
Ymatebydd: Laura Franklin
Crynodeb o'r Gynrychiolaeth:
In 2007 I was one of many Cubbington residents that had to leave their home when our properties flooded. The drainage system could not cope with the amount of water and waste. The development will put a massive strain on the existing drainage system and puts the village at a greater risk of flooding again. The current drainage system could not cope with the waste and water of up to 2,000 new homes and developing it to do so would be a large expense and cause a great deal of disruption to existing residents.