BASE HEADER
Gwrthwynebu
Alternative Sites Consultation
ID sylw: 44033
Derbyniwyd: 07/04/2010
Ymatebydd: Mr and Mrs M Calvert
The increased traffic would cause congestion and problems for school children. The roads were NOT built to take that sort of traffic through cul-de-sac roads that have been opened up.
Cubbington should remain as a village and greenbelt land should not be built on.
Also the structure of the soil is totally unsuitable for building and would cause flooding down in Cubbington.
The increased traffic would cause congestion and problems for school children. The roads were NOT built to take that sort of traffic through cul-de-sac roads that have been opened up.
Cubbington should remain as a village and greenbelt land should not be built on.
Also the structure of the soil is totally unsuitable for building and would cause flooding down in Cubbington.