BASE HEADER

Sylw

Alternative Sites Consultation

ID sylw: 44160

Derbyniwyd: 07/04/2010

Ymatebydd: Environment Agency

Crynodeb o'r Gynrychiolaeth:

As with all sites over one hectare in size a Flood Risk Assesment will be required to cover site drainage and to consider the watercourse that bisects the centre of the site.

Testun llawn:

As with all sites over one hectare in size a Flood Risk Assesment will be required to cover site drainage and to consider the watercourse that bisects the centre of the site.