ID sylw: 44163

Derbyniwyd: 07/04/2010

Ymatebydd: Environment Agency

Crynodeb o'r Gynrychiolaeth:

The majority will be developable, but there will be floodplain implications for the site.

A detailed level 2 FRA is required to determine the precise flood plain and surface water drainage.

Need to ensure that the development doesn't produce any cross catchment transfers.

The site is sensitive in terms of protection requirements for 'Controlled Waters'. The whole formation is classified as a Principal Aquifer. The site is 2.5 km from two STW public supply boreholes.

As this is a large area, further site investigation will need to confirm the exact environmental details of the site as well as a risk assessment.