BASE HEADER
Gwrthwynebu
Alternative Sites Consultation
ID sylw: 44222
Derbyniwyd: 16/03/2010
Ymatebydd: Stella Storer
We have still not had any redress for the severe flooding in the lower part of the village in June 2007. Until such a time as a viable alleviation scheme is approved - any concreting over of natural drainage would be a disaster waiting to happen. It is hoped that the Severn Trent Water will scratch this audacious place at source as the waste from up to 1000 houses pouring into Cubbington's already overloaded sewage system is not worth thinking about.
We have still not had any redress for the severe flooding in the lower part of the village in June 2007. Until such a time as a viable alleviation scheme is approved - any concreting over of natural drainage would be a disaster waiting to happen. It is hoped that the Severn Trent Water will scratch this audacious place at source as the waste from up to 1000 houses pouring into Cubbington's already overloaded sewage system is not worth thinking about.