BASE HEADER
Gwrthwynebu
Alternative Sites Consultation
ID sylw: 44224
Derbyniwyd: 16/03/2010
Ymatebydd: Mr G E Higham
Crynodeb o'r Gynrychiolaeth:
We are still waiting for a flood alleviation scheme.
No more development until existing drains are sorted out and surface water under control. Previous developments have been passed without the consideration of drainage situation and ditch maintenance.
Testun llawn:
We are still waiting for a flood alleviation scheme.
No more development until existing drains are sorted out and surface water under control. Previous developments have been passed without the consideration of drainage situation and ditch maintenance.