BASE HEADER

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44496

Derbyniwyd: 08/04/2010

Ymatebydd: Stansgate Planning

Crynodeb o'r Gynrychiolaeth:

2 - This would be unacceptable as it is a very large parcel of land which would inevitably be at the loss of other more preferable sites currently proposed for development. It is less sustainable than other sites proposed in the Preferred Options Draft and Alternative Sites paper. Parts of the site suffer from flooding and are prominent from a landscape perspective.