BASE HEADER

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44885

Derbyniwyd: 29/03/2010

Ymatebydd: P D & M N S Gorrill

Crynodeb o'r Gynrychiolaeth:

The existing road network is just about adequate but would be totally inadequate without further major road works.

The existing schools in the area are already oversubscribed and could not possibly cope with the additional number of children that this development would bring. Just look at the mess that was created to the children's scholastic needs at Warwick gates.

Testun llawn:

The existing road network is just about adequate but would be totally inadequate without further major road works.

The existing schools in the area are already oversubscribed and could not possibly cope with the additional number of children that this development would bring. Just look at the mess that was created to the children's scholastic needs at Warwick gates.