BASE HEADER
Gwrthwynebu
Alternative Sites Consultation
ID sylw: 44926
Derbyniwyd: 01/04/2010
Ymatebydd: Gill Foster
Crynodeb o'r Gynrychiolaeth:
The greenbelt should be retained.
The existing road infrastructure is not suitable to support the significant increase in traffic that would be generated.
Junctions are already overloaded and dangerous at peak times.
The impervious heavy clay subsoil causes the site to be prone to flooding.
Such a large scale development would significantly increase cross town traffic and congestion as all of the major food retailers and employment opportunities are located South of the river, accessed by only 4 crossings.
If this proposal went ahead it would be a disaster!