BASE HEADER

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 44939

Derbyniwyd: 25/03/2010

Ymatebydd: Elaine Golder

Crynodeb o'r Gynrychiolaeth:

1. Cubbington village has suffered severe flooding on several occasions. A flood alleviation scheme to prevent future flooding has yet to be completed. Development will cause a greater risk of severe flooding in the future.
2. The roads through the village are not suited for the potential increase in numbers of road users. Several accidents have already occurred on the roads. A fatality occurred on the Rugby Road and calls for a pedestrian crossing have been rejected.
3. Local schools are running at capacity.
4. The character of Cubbington village will be lost if it is permanently joined to Lillington.