There are already drainage problems without adding to it.
Traffic comes along Offchurch Road and Windmill Hill sometimes on the wrong side of the road at speed. Added difficulty from huge farming vehicles. It is very dangerous getting out of my drive on Cross Lane. If Windmill Hill is blocked with cars it will be horrendous. Cars going past the church are usually one lane as cars are parked up there.
Added delays, more traffic, none of these lanes were designed for speeding cars and big vehicles. It is all too dangerous as it is with traffic passing through Cubbington.