BASE HEADER

Gwrthwynebu

Alternative Sites Consultation

ID sylw: 45207

Derbyniwyd: 07/04/2010

Ymatebydd: P E Judson

Crynodeb o'r Gynrychiolaeth:

Having been flooded in the 2007 floods, I am very concerned about the effect this proposal will have on the drainage system in the village. Building on this site will affect the surface water run-off, creating more pressure on the drainage system.
I am also very concerned about the increase of traffic. The area is already a black spot for accidents. The pressure to this junction will be doubled on school runs and peak times.
If we lose the greenbelt around the village, we lose wildlife and a village way of life will be lost.