BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 46222

Derbyniwyd: 13/06/2012

Ymatebydd: Mrs Sheila Smith

Crynodeb o'r Gynrychiolaeth:

The council still seems hell-bent on adding large amounts of building to areas such as Harbury Lane which suffered badly when Warwick Gates was built without regard to infrastructure. Building to the South of Leamington and Warwick still gives the problem that there are few bridging points over the river. Even if Europa way is dualled, there will still be inevitable traffic jams around the roundabouts and backing up from the river bridges. If the work is over the bridges (in the North) then that is where the bulk of the housing needs to be.

Testun llawn:

The council still seems hell-bent on adding large amounts of building to areas such as Harbury Lane which suffered badly when Warwick Gates was built without regard to infrastructure. Building to the South of Leamington and Warwick still gives the problem that there are few bridging points over the river. Even if Europa way is dualled, there will still be inevitable traffic jams around the roundabouts and backing up from the river bridges. If the work is over the bridges (in the North) then that is where the bulk of the housing needs to be.