BASE HEADER
Gwrthwynebu
Preferred Options
ID sylw: 46295
Derbyniwyd: 28/06/2012
Ymatebydd: Mr Paul Newton
Crynodeb o'r Gynrychiolaeth:
Decreasing the permiability of the ground by building on this site will result in increased flow into the drainage brook downstream of where it deals with the surface water on the west side of the railway. This will cause the water to back up into Fieldgate Lane, resulting in flash flooding.
Testun llawn:
Due to local topology, all the surface water in the area between the Golf Club and the railway line ...
[dangos mwy]