BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 46496

Derbyniwyd: 15/07/2012

Ymatebydd: Mr Neil Halliday

Crynodeb o'r Gynrychiolaeth:

Building the NLRR from the A46 to Sandy Lane near Old Milverton is only necessary to facilitate quicker access to the employment sites and M40 to the south of Leamington.

The NLRR will encourage the greater use of Old Milverton Road as a rat run. Street parking at the Rugby Road end combined with the tight bend and narrow railway bridge at Old Milverton makes this road unsuitable for high traffic flows.

The NLRR would be the catalyst to encourage a future change to the North Leamington "Green Wedge" designation to permit further infill development.

Testun llawn:

Building the NLRR from the A46 to Sandy Lane near Old Milverton is only necessary to facilitate quicker access to the employment sites and M40 to the south of Leamington.

The NLRR will encourage the greater use of Old Milverton Road as a rat run. Street parking at the Rugby Road end combined with the tight bend and narrow railway bridge at Old Milverton makes this road unsuitable for high traffic flows.

The NLRR would be the catalyst to encourage a future change to the North Leamington "Green Wedge" designation to permit further infill development.