ID sylw: 46559
Derbyniwyd: 18/07/2012
Ymatebydd: Roger Mills
Under the plan as it stands, the majority of development will involve land currently within the Green Belt. It seems to be thought acceptable simply to re-draw the Green Belt boundaries so as to re-designate land as being outside - so that it can be built on. This makes a mockery of the whole process! Green Belt land should only be developed in very exceptional circumstances - none of which have been demonstrated by this Plan. If the growth plan is scaled back to a realistic level, very little Green Belt land will need to be developed.
Under the plan as it stands, the majority of development will involve land currently within the Green Belt. It seems to be thought acceptable simply to re-draw the Green Belt boundaries so as to re-designate land as being outside - so that it can be built on. This makes a mockery of the whole process! Green Belt land should only be developed in very exceptional circumstances - none of which have been demonstrated by this Plan. If the growth plan is scaled back to a realistic level, very little Green Belt land will need to be developed.