The original allocation of 6986 dwellings in Table 7.1 has been increased to 8360 in Table 7.2 to cater for likely shortfalls and the possibility of the Gateway development occurring.
Significant additional housing in villages will cause transport requirements and costly multiple infrastructure improvements.

The Gateway development should be considered as an additional requirement and planned as a separate project requiring housing in the locality rather than throughout the District.

Development in the villages should be reduced to maintain the specific individual character of the Warwick District villages

Testun llawn:

The original allocation of 6986 dwellings in Table 7.1 has been increased to 8360 in Table 7.2 to cater for likely shortfalls and the possibility of the Gateway development occurring.
Significant additional housing in villages will cause transport requirements and costly multiple infrastructure improvements.

The Gateway development should be considered as an additional requirement and planned as a separate project requiring housing in the locality rather than throughout the District.

Development in the villages should be reduced to maintain the specific individual character of the Warwick District villages