BASE HEADER
Gwrthwynebu
Preferred Options
ID sylw: 46778
Derbyniwyd: 23/07/2012
Ymatebydd: Mrs Cathy Jorgensen
Norton Lindsey does not have the facilities and road- and transport infrastructure to accommodate the proposed number of homes and it being identified as a Category 2 village is at odds with PO3 and the requirement for housing to be built close to existing shops, schools (with free capacity), leisure facilities, workplaces. An increase of 30-80 houses would be entirely disproportionate to the current size of the village and would as a result have a significant impact on the current environment and inhabitants.
Norton Lindsey does not have the facilities and road- and transport infrastructure to accommodate the proposed number of homes and it being identified as a Category 2 village is at odds with PO3 and the requirement for housing to be built close to existing shops, schools (with free capacity), leisure facilities, workplaces. An increase of 30-80 houses would be entirely disproportionate to the current size of the village and would as a result have a significant impact on the current environment and inhabitants.