BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 47258

Derbyniwyd: 27/07/2012

Ymatebydd: Dr GUy Barker

Crynodeb o'r Gynrychiolaeth:

The plan does not seem to consider the effect of the proposed development on the areas between kenilworth and leamington. The traffic problems currently faced would be greatly exascerbated by the proposed designation of green belt land. The infrastructure is simply insufficent as exemplified by the current sewerage problems. The HS2 scheme will cut through much of these areas and cut current transport routes increasing transport problems. The cyclepaths are not safe enough to use

Testun llawn:

The plan does not seem to consider the effect of the proposed development on the areas between kenilworth and leamington. The traffic problems currently faced would be greatly exascerbated by the proposed designation of green belt land. The infrastructure is simply insufficent as exemplified by the current sewerage problems. The HS2 scheme will cut through much of these areas and cut current transport routes increasing transport problems. The cyclepaths are not safe enough to use