BASE HEADER
Gwrthwynebu
Preferred Options
ID sylw: 47407
Derbyniwyd: 02/08/2012
Ymatebydd: Mr Raymond Bullen
the 10,800 dwelling requrement is too high. Updating SHMA and using 2011 census data & NPPF requirements only 5,336 dwellings are necessary to meet local needs and this includes a 5% contingency. Deduct 3814 committed, windfall & small SHLA sites an 1522 remain. But 1,230 other brownfield / regeneration potential exists in urban areas that would benefit from it. This leaves 292 homes to found in villages, greenbelt and rural.
the 10,800 dwelling requrement is too high. Updating SHMA and using 2011 census data & NPPF requirements only 5,336 dwellings are necessary to meet local needs and this includes a 5% contingency. Deduct 3814 committed, windfall & small SHLA sites an 1522 remain. But 1,230 other brownfield / regeneration potential exists in urban areas that would benefit from it. This leaves 292 homes to found in villages, greenbelt and rural.