ID sylw: 47855
Derbyniwyd: 26/07/2012
Ymatebydd: Mr Adrian Baskott
Crynodeb o'r Gynrychiolaeth:
Why is the Green Belt being developed which is in total contradiction to the Core Strategy 1996-2011, which stated that the unnecessary development of Greenfield land would be resisted. Why have previously selected and accepted brown and white field sites been replaced with Green Belt sites?.Evidence of a 'special circumstance' needs to be provided. The construction of further homes will increase traffic levels beyond the capacity of the existing road network. The North Leamington relief road will not alleviate local congestion and increase noise light and air pollution. The number of homes to be built in the Green Belt, appear to be out of proportion with local needs.