BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 48527

Derbyniwyd: 26/07/2012

Ymatebydd: Kirsti Sispal

Crynodeb o'r Gynrychiolaeth:

A "Northern Relief Road" is not required. The road will serve no purpose other than to take new home owners quickly on to the A46 and to jobs and shopping opportunities away from our Towns. It will need to be built across the flood plain and will violate an important nature corridor along the River Avon. If the proposed development is concentrated in the South of Leamington there is an existing road network that could be upgraded at considerably lower cost.