BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 48613

Derbyniwyd: 25/07/2012

Ymatebydd: Centro

Crynodeb o'r Gynrychiolaeth:

Disappointed that the Local Plan opposes the preferred route for the proposed High Speed Rail Line between London and Birmingham that will pass through the district boundary.
Local Plan should consider and address strategic importance of proposed High Speed 2 Interchange station at Birmingham Airport.
Proximity of station to WDC, an expected catalyst should be seen as opportunity to benefit.