BASE HEADER
Gwrthwynebu
Preferred Options
ID sylw: 48963
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Andrew Klapatyj
Crynodeb o'r Gynrychiolaeth:
The situation has not changed since the 2009 Core Strategy was produced.
The Green belt would be permantly damaged undermining separation betweentowns and the historical character of the area.
There would be increased congestion and massive infrastructure would be required to support the growth.