BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 49037

Derbyniwyd: 27/07/2012

Ymatebydd: Quadrant Land plc

Asiant : Harris Lamb

Crynodeb o'r Gynrychiolaeth:

The Plan requires the release of windfall sites to make up the housing numbers (21% of that requirement) This may require the release of greenfield sites. therefore PO4 D should be re-worded to allow for the release of non Green Belt sites adjoining the edge of the built up edge of Warwick or Leamington.

Testun llawn:

Scanned Representations

Atodiadau: