Suggests second point in para 18.5 pg 97 reads "To ensure new development does not increase flooding from pluvial (surface water, run off) and fluvial (river) sources.
Suggests that taking a catchment based approach would identify upstream and downstream issues with neighbouring authorities supporting the duty to cooperate requirement.
The wording of PO18 on pg 98 should be amended in line with the NPPF to state "no development in Flood Zone 3 unless it is water compatible." The plan should also include a committment to ensure all new development acheives greenfield rates of surface drainage. In addition no development should take place without provision of infrastructure to ensure there is no deterioration of the local water bodies and should seek any opportunities to contribute to WFD objectives. PO18 makes no reference to wastewater, sewerage capacity and sewage treatment capacity at local treatment works. Supports efficient use of water but plan should include specific targets i.e the level of Code for Sustainable Homes and BREEAM to be acheived. The infrastructure delivery plan should consider the impact of growth in Coventry and other authorities discharging into the River Avon when examining capacity at Finham and Longbridge sewage works. Highlights the potentially high carbon emissions associated with implementing greywater recycling systems necessary to acheive code level 5 / 6 suggested in the IDP. Supports the comments in the IDP to ensure that appropriate infrastructure is in place to meet demand for waste collection services in accordance with the waste hierachy.