BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 49506

Derbyniwyd: 12/07/2012

Ymatebydd: Mr Arthur Deeming

Crynodeb o'r Gynrychiolaeth:

The infrastructure is not adequate enough to sustain new growth. There would be increased pressure on the flood plain which would heighten the flood risk.
The drainage system is already overstreched.

Testun llawn:

As scanned.

Atodiadau: