BASE HEADER
Gwrthwynebu
Preferred Options
ID sylw: 49526
Derbyniwyd: 10/07/2012
Ymatebydd: Mrs Pamela Beedham
Crynodeb o'r Gynrychiolaeth:
If HS2 goes ahead as well as these plans then two areas of green belt would be lost.
Only a few houses would be acceptable as the road system would struggle with more built.
Some areas are already stationery at peak times.
There is not enough space to alter the road infrastructure and also areas of natural habitat would be lost.
Testun llawn:
As scanned.