BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 50105

Derbyniwyd: 16/07/2012

Ymatebydd: Professor Christopher John Miller

Crynodeb o'r Gynrychiolaeth:

Objects to the development of North Milverton and Blackdown as it would have a substantial and permanent effect on the local community.
The allocations do not accord with the NPPF that requires 'exceptional circumstances' to be established before green belt sites can be considered. It is stated that the required targets for housing growth can be realised by the use of alternative land (non-Green Belt) to the south of Leamington. There are also concerns that additional (new) infrastructure will be required to deliver the north Leam Green Belt sites that will require even more land being lost at this sensitive location and the eventual move towards coalescence with Kenilworth. Potential traffic problems associated with alterations to the Kenilworth road improvements are also stated as a cause for concern.

Testun llawn:

scanned form

Atodiadau: