BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 50274

Derbyniwyd: 03/08/2012

Ymatebydd: Cllr Elizabeth Higgins

Crynodeb o'r Gynrychiolaeth:

No way that Warwick's fragile infrastructure of roads and bridges can cope with a 27% increase in traffic. Junction and carriageways are below national standards and accidents can cause absolute grid-lock in the town. The Earl of Warwick built bridge (dating from 1797) has been the location for a serious fatal accident. There are also locations in Warwick which cause considerable congestion and re-routing of traffic due to historic infrastructure (e.g. rail bridge near Salisford).

Atodiadau: