BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 50337

Derbyniwyd: 27/07/2012

Ymatebydd: Mr Peter Robbins

Crynodeb o'r Gynrychiolaeth:

There is a contingency in the Preferred Options to the tune of 1400 homes. Detailed investigation of the low numbers assumed for allocations on sites such as the fire station and other town centre sites indicate that there is also a further hidden contingency. The council appears to be building contingency upon contingency. May also have oversupply of land on non-greenbelt land previously supported as suitable for development. Take away this contingency or buffer and there is no need to include the green belt land at Milverton.
The approach is a complete change in direction compared with the 2009 Core Strategy document. 'Sharing the pain' is not justification for departing from this and has arisen from pressure not to build South of Leamington. Traffic surveys have not been carried out and infrastructure investigation is being used to justify the plan rather than being the basis for it. There is no evidence to suggest a larger number of houses could not be delivered in South Leamington.