BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 50719

Derbyniwyd: 02/08/2012

Ymatebydd: Mr Patrick Swann

Crynodeb o'r Gynrychiolaeth:

Sites 4 and 5 - there is no credible argument put forward in the plan as to why the main strategic constrain (the green belt policy) should be forfeited, by the proposed building of 2000 houses and possible employment facilities in the Green Belt on sites 3 and 4 when there is more suitable (non-green belt options that can fulfil that requirement. The current main employment opportunities/ areas for the area lie south of Warwick and Leamington and are well related to the strategic motorway network. The two suggested allocation 4 and 5 would result in unnecessary cross town commuting. These allocations should therefore be deleted, and the Green Belt protected accordingly.

Testun llawn:

See Attached.