BASE HEADER

Gwrthwynebu

Publication Draft

ID sylw: 5144

Derbyniwyd: 17/09/2009

Ymatebydd: Mrs ME Shaw

Crynodeb o'r Gynrychiolaeth:

Object to sites south of Warwick, Whitnash and Leamington:
Infrastructure cannot cope with more, roads, schools cannot cope.
Water supply problems following development at Warwick Gates eventually sorted out, but likely to return with further building. Surface water on roads still a problem and leads to blockage of drains and local flooding.