BASE HEADER

Gwrthwynebu

Revised Development Strategy

ID sylw: 53382

Derbyniwyd: 23/07/2013

Ymatebydd: mr william tansey

Crynodeb o'r Gynrychiolaeth:

proposals at the Bericote and Blackdown roundabouts are unnecessary. The roundabout system grants priority to heavy traffic in an un-managed manner which allows priority to heavier traffic flow. Singalled junctions would require more maintenance and constant monitoring to ensure their effectiveness at positively contributing to traffic flow. Update and improvement of the current roundabouts with the addition of a feeder lane between the A452 and Bericote road and cucle/pedestrian crossing lights should be considered.

Testun llawn:

proposals at the Bericote and Blackdown roundabouts are unnecessary. The roundabout system grants priority to heavy traffic in an un-managed manner which allows priority to heavier traffic flow. Singalled junctions would require more maintenance and constant monitoring to ensure their effectiveness at positively contributing to traffic flow. Update and improvement of the current roundabouts with the addition of a feeder lane between the A452 and Bericote road and cucle/pedestrian crossing lights should be considered.