Already at peak time the traffic lighted system on the Old Budbrooke Road bridge at peak time can be backed up towards Blanford Way. Addition housing will inevitably increase difficulties leaving the village. I addition the traffic lights at the A4177/Old Budbrooke Road junction is set to approximately 15 seconds, causing tailbacks when the main road has over 90 seconds. Thus at peak times only 9 vehicles can exit onto the main road, providing there are no hold ups on Stanks Island, which again at peak times is frequent.

Testun llawn:

RDS 5 PARA 4.4

The sewerage system is running to almost full capacity and is unlikely to cope with the added volume increase.

Budbrooke infant school places are much sort after and could not possibly accommodate added pupils.

Already at peak time the traffic lighted system on the Old Budbrooke Road bridge at peak time can be backed up towards Blanford Way. Addition housing will inevitably increase difficulties leaving the village. I addition the traffic lights at the A4177/Old Budbrooke Road junction is set to approximately 15 seconds, causing tailbacks when the main road has over 90 seconds. Thus at peak times only 9 vehicles can exit onto the main road, providing there are no hold ups on Stanks Island, which again at peak times is frequent.