BASE HEADER
Gwrthwynebu
Revised Development Strategy
ID sylw: 53511
Derbyniwyd: 25/07/2013
Ymatebydd: Mark Baker
Infrastructure (particularly roads both into the village and those within the village that would lead to the site) are not capable of sustaining the additional load that would be put on them.
The scale of the proposed development is not appropriate for the village infrastructure. The road network into the village is not sufficient to cope with the proposed development - the main access is via a single file road under the railway bridge and this already struggles to cope with the traffic volumes created by the continuing popularity and expansion of the Warwick Parkway train station.
The new development would also only be accessible via two small roads leading into the proposed site and these would not be sufficient to cope with an additional 300+ vehicles each day (assuming 150 homes with each house averaging 2 vehicles).
Whilst I accept new homes need to be built somewhere, the infrastructure of the village does not lend itself to new development and therefore is unsuitable for the proposed plan.