BASE HEADER
Gwrthwynebu
Revised Development Strategy
ID sylw: 53560
Derbyniwyd: 25/07/2013
Ymatebydd: Hampton Magna Action Group
Crynodeb o'r Gynrychiolaeth:
We do not accept that this level of housing is really necessary. The constantly changing number perceived as required has escalated 1400 in just a year. The uncertainty and time frame of the plan a long way hence leads means the level of housing needs reconsidering alongside other regions
Testun llawn:
We do not accept that this level of housing is really necessary. The constantly changing number perceived as required has escalated 1400 in just a year. The uncertainty and time frame of the plan a long way hence leads means the level of housing needs reconsidering alongside other regions